No. Project Year 2007   Description of works Project Image
1 Proposed A&A to Existing Shipyard at No.15 & No.5 Benoi Rd   Micropiling Works  
         
2 Slope Stabilization Works at Bukit Panjang Link and Portsdown Gate   Slope Stabilization Works View Image
         
3 Proposed Upgrading & Addition of Process Equipment to Existing Single User Polystyrene Plant at 53 Tuas Crescent   Micropiling Works  
         
4 Proposed Condominium Housing Development at Telok Blangah Road - The Reflections at Keppel Bay   Soil Nailing, Micropiles, Shotcrete and Grouting Works View Image
         
5 Micropiling works at Bukit Batok Pavillion Park Phase 2A, 2B and 2C   Micropiling Works View Image
         
6 Proposed Erection of a 15-Storey Residential Apartment at 18 St. Michael's Road   Jet Grouting Works  
         
7 Term Contract for Campus Wide Slope Stabilization in NUS   Slope Stabilization Works  
         
8 No.3 Namly Drive   Micropiling Works View Image
         
9 The Sail @ Marina Bay   Chemical Grouting  
         
10 Proposed A&A to Existing Invista Adipic Site Involving Erection of no. 1 Ammonia Storage Tank and
Ancillary Facilities at 1 Sakra Avenue, Jurong Island
  Vibration Monitoring Works  
         
11 Improvement to Joan Road Outlet Drain   Instrumentation Works  
         
12 Proposed A&A works to Maghain Aboth Synagogue at Waterloo Street   Shotcreting Works View Image
         
13 Temporary Cofferdam for the Construction of Serangoon East Dam   Tie Back Anchor View Image
         
14 Building Works for the LUP contract 35   Instrumentation Works  
         
15 Repairs & Redecoration and Improvement Works to 19 Blocks at Tanjong Pagar Division   Micropiling Works  
         
16 Proposed Erection of A Block of 5 Storey Flats at Koon Seng/ Pulasan Road   Jet Grouting Works View Image
         
17 Proposed New Erection of Underground Sprinkler Tank Room & Internal A&A at NUH   Soil Nailing Works  
         
18 Permanent Ground Anchor at Gul Road   Ground Anchor View Image
         
19 Pumping Tests at Sentosa IR   Drilling of Boreholes View Image
         
20 Proposed Erection of 2-Storey Detached Dwelling House with Basement and an Attic at BishopGate   Micropiling Works View Image
         
21 The Inspra Condominium at Martin Road   Soil Nail and Shotcreting Works View Image
         
22 Proposed Micropile System to replace Bore Piling System at Pavillion Park, Bukit Batok Road (Unit Type M5 - 10 units)   Micropiling Works  
         
23 Proposed Construction of the Common Services Tunnel Phase 1B&2 at Marina South   Jet Grouting Pile Works behind CBP Wall View Image