No. Project Year 2011   Description of works Project Image
1 Improvement, Repairs and Replacement Works on the Wooden Fender System for the wharf of Jurong Fishery Port   Crack Repair Works View Image
         
2 PU Grouting at 37 Lorong Ong Lye   PU Grouting View Image
         
3 Proposed condominium housing development comprising 23 blocks of 6/12/18/24 storey apartments (Total 1040 units) with commercial use at 1st storey & ancillary facilities on lots 2443 (T), 2444A-PT & 1531A MK01 at Alexandra Road/Depot Road (The Interlace)   Post tensioning works View Image
         
4 Drainage Repair Works at 6th Floor of Tritech Building   Drainage Pipe Repair Works  
         
5 RC Beam Repair at Energizer (S) Pte Ltd   Prepack pressure grouting to beam  
         
6 Waterproofing of roof deck & installation of rainwater down pipe at Jalan Belangkas.   Waterproofing works  
         
7 Proposed pedestrian overhead bridge at Woodlands Ave 7 (Package 1)   Supply and installation of elastomeric bearing pads View Image
         
8 Concrete repair of pump room ceiling at Techlink Building at Kaki Bukit Road 3   Concrete Repair Works